Microsoft is known for its secure and updated products. Unlike other ERP and CRM software, Dynamics 365 offers in Dubai promised regulation updates and upgradation of their services from time to time. While these regular updates add extra features and security to your system, they are time-consuming and sometimes bring unexpected issues and downtime. To minimize these negative effects of your Dynamics 365 upgrade, you should be ready beforehand. So, here we are sharing with you exactly the timeline for D365 updates and what you should expect and plan for before these major upgrades.

Microsoft Dynamics 365 Upgrades Timeline

Microsoft usually provides two major upgrades and updates in a year, with a proper timeline and schedule. These updates come in two waves. Wave 1 lasts from April to September, and the Wave 2 updates come in between October and March. Besides these two major update waves, Dynamics 365 keeps pushing small service updates for security and bug fixing throughout the year.

Let’s see what you can expect with these updates and how you can be prepared for these updates in advance.

What to Expect?
  • Two Major Updates in a Year

As mentioned, Microsoft follows a biannual approach for its Dynamics 365 system update in Dubai, which means releasing major updates twice a year. So, you can expect to get these updates from April to September and from October to March.

  • Regular small updates

While releasing two major upgrades, its regular small updates keep coming throughout the year to ensure that your system is equipped with the latest features, security, and compatibility. However, since these updates are smaller in size and bring minor changes, they won’t have any significant issues with your ERP system.

  • Continuous updates

With Dynamics 365, you’re assured to get continuous Dynamics 365 upgrade for better use, the latest features, and smooth performance. You should expect some new and more advanced technology with each of your major continuous updates and bug fixes, with minor regular updates.

  • Pause and automate the updates

Although Microsoft recommends you keep your ERP system updated in UAE, it also gives you the ability to pause and automate all updates as per your requirements. This ability is particularly crucial to ensure that the system doesn’t get into any potential trouble suddenly, and you have control over when and how to update your system as per your convenience.

What to plan for?

Here are some points and actions that you must plan for in advance to make sure you get the most out of every update without any service interruption

  • Test Before apply

It is not necessary to install every update as it comes; instead, you should first test these updates and changes in a test environment, and once these major updates pass your test, they are ready to be implemented in production.

However, if you find any issue or lag during your testing, it is suggested to not install it in the system and keep it paused.

  • Ensure the customization compatibility

If your system is integrated with any custom application or software in Dubai, make sure to test the customisation compatibility with each of the updates. While most of the update will not have any compatibility issues, it is better to check before applying the changes.

  • Plan before updates knock

Plan all your update schedules and timing beforehand so that when updates really push you, you are prepared to get them without any interruption in the service. You can schedule these updates when your system is not in use and you have enough time to process updates and implement them.

Summary

With the One Version initiative by Microsoft, keeping your Dynamics 365 upgrade in UAE is crucial with the right expectations and planning. You will get two major updates in a year with D365 and regular service updates throughout the year. Planning includes checking the updates Before applying, scheduling the updates, and having proper documentation of updates and communication with stakeholders